Откуда эта цифра
Удержанный гарантийный резерв (ретенция ÷ поэтапные счета)
Оценочное значение
Недоступно
- Как она получена
- Retention receivable / withheld cash
Источники
- Reasoned Construction Estimate (10% Retainage Withheld). Basis · 5–10% Retainage Is The Near Universal Contract Term In Us Commercial Construction (many States Cap Public Works Retainage At 5–10%); 10% Is The Common Private Contract Ceiling. The Figure Is A Contract Term, Not A Surveyed Benchmark, So No Statistical Source Url Is Cited. Re Validate Against The Tenant's Contract Terms And Retainage Receivable Balance. · published benchmark / reasoned-estimate citation
Допущения — обоснованные значения по умолчанию
- Retainage withheld (retention receivable ÷ progress billings): Reasoned construction estimate (10% retainage withheld). Basis: 5–10% retainage is the near-universal contract term in US commercial construction (many states cap public-works retainage at 5–10%); 10% is the common private-contract ceiling. The figure is a contract term, not a surveyed benchmark, so no statistical-source URL is cited. Re-validate against the tenant's contract terms and retainage-receivable balance.
Подтвердите их по договору/книгам, чтобы поднять уровень доказательности.
Уровень доказательности
У этой цифры нет сигнала об источнике, поэтому мы считаем её непроверенным допущением.
- Наблюдаемое Привязано к подтверждённой источником цифре в ваших книгах.
- Объяснённое Производное, но каждый вход прослеживается до наблюдаемых данных.
- Выведенное Обоснованное значение по умолчанию — допустимое, но не измеренное.
- Гипотеза Сырое допущение, которое ещё нужно проверить.