Woher diese Zahl stammt
Einbehalt (Sicherheitseinbehalt ÷ Abschlagsrechnungen)
Geschätzter Wert
Nicht verfügbar
- Wie sie entsteht
- Retention receivable / withheld cash
Quellen
- Reasoned Construction Estimate (10% Retainage Withheld). Basis · 5–10% Retainage Is The Near Universal Contract Term In Us Commercial Construction (many States Cap Public Works Retainage At 5–10%); 10% Is The Common Private Contract Ceiling. The Figure Is A Contract Term, Not A Surveyed Benchmark, So No Statistical Source Url Is Cited. Re Validate Against The Tenant's Contract Terms And Retainage Receivable Balance. · published benchmark / reasoned-estimate citation
Annahmen — begründete Standardwerte
- Retainage withheld (retention receivable ÷ progress billings): Reasoned construction estimate (10% retainage withheld). Basis: 5–10% retainage is the near-universal contract term in US commercial construction (many states cap public-works retainage at 5–10%); 10% is the common private-contract ceiling. The figure is a contract term, not a surveyed benchmark, so no statistical-source URL is cited. Re-validate against the tenant's contract terms and retainage-receivable balance.
Bestätigen Sie diese im Vertrag/in den Büchern, um die Evidenzstufe zu erhöhen.
Evidenzstufe
Diese Zahl trägt kein Quellensignal, daher behandeln wir sie als ungeprüfte Annahme.
- Beobachtet Auf eine quellbestätigte Zahl in Ihren Büchern zurückgeführt.
- Erklärt Abgeleitet, aber jede Eingabe lässt sich auf beobachtete Daten zurückführen.
- Abgeleitet Ein begründeter Standardwert — vertretbar, aber nicht gemessen.
- Hypothese Eine rohe Annahme, die noch überprüft werden muss.