De dónde viene este número
Retención de garantía (retención por cobrar ÷ certificaciones de avance)
Valor estimado
No disponible
- Cómo se produce
- Retention receivable / withheld cash
Fuentes
- Reasoned Construction Estimate (10% Retainage Withheld). Basis · 5–10% Retainage Is The Near Universal Contract Term In Us Commercial Construction (many States Cap Public Works Retainage At 5–10%); 10% Is The Common Private Contract Ceiling. The Figure Is A Contract Term, Not A Surveyed Benchmark, So No Statistical Source Url Is Cited. Re Validate Against The Tenant's Contract Terms And Retainage Receivable Balance. · published benchmark / reasoned-estimate citation
Supuestos — valores predeterminados razonados
- Retainage withheld (retention receivable ÷ progress billings): Reasoned construction estimate (10% retainage withheld). Basis: 5–10% retainage is the near-universal contract term in US commercial construction (many states cap public-works retainage at 5–10%); 10% is the common private-contract ceiling. The figure is a contract term, not a surveyed benchmark, so no statistical-source URL is cited. Re-validate against the tenant's contract terms and retainage-receivable balance.
Confírmalos en tu contrato/libros para elevar el nivel de evidencia.
Nivel de evidencia
Esta cifra no tiene señal de fuente, así que la tratamos como un supuesto sin verificar.
- Observado Citado a una cifra confirmada por la fuente en tus libros.
- Explicado Derivado, pero cada insumo se rastrea hasta datos observados.
- Inferido Un valor por defecto razonado — defendible, pero no medido.
- Hipótesis Un supuesto en bruto que aún necesita verificación.