Where this number comes from

Food + labor prime cost (food + beverage + labor ÷ revenue)

food_and_labor_cost_ratio_pct

Observed

Observed value

19000

Actual
19000
Plan
Forecast
How it's produced
Prime cost — food, beverage and labor
Period
2026-04-30
Owner
Unassigned

Sources

Assumed inputs — reasoned defaults

Confirm these in your contract/books to upgrade the evidence level.

Evidence level

value cited to a source-confirmed fact (gl:tx_2026_04_food_cost) — anchored to a ledger / model-run transaction

Observed Explained Inferred Hypothesis