Ataski
Sign up
Sample workspace — example data, not your own. Sign up free to run it on your own.
Ataski Financial Analyst
Currency USD Example Ask the analyst
Example: Manufacturing
Change example

Which choices need action, which are underway, and did the last ones land.

✦ Ask the analyst

Available on every tab in your workspace — answers come with sources, the period, the calculation, and a confidence level.

Answers run on your connected books after signup. The sample keeps every number deterministic — it never improvises a reply.

DECISIONS AND FOLLOW-UP

What was decided, who owns it and when to review

A short working log: the decision, its owner, the due date, the expected effect and the actual outcome. No automatic scoring and no invented “percent complete”.

  1. State Outcome recorded Decision Approved: hold the next Reigate assembly run to make-to-order and draw down the early finished-goods build before restocking. Finished-goods days inventory (avg finished goods ÷ COGS × 365) Observed Modelled a scenario Owner Priya Anand (Ops) Decided · review by 2026-04-17 2026-06-12 Effect when decided $84 Outcome -5 At review: 79
    Assumptions on the day

    · The June ship date had enough buffer to absorb a make-to-order run.

    · Raw + WIP inventory were already at plan — only finished goods had built.

    Since this decision · Inferred
    Expected effect (as modelled)$84
    At decision84
    At review79
    Movement-5

    No on-track score is derived from these. The expected figure is the size of a modelled effect; the observed figure is how the metric's level moved. They are different quantities, and nothing here measures the decision's own financial effect.

    Hypothesis holds (inferred)

    An inferred association over a window where other factors also changed — never a proven cause.

    View metric lineage →

Showing 1 of 2 · Decisions are captured from Today cards and modeled scenarios — with the numbers as they stood at decision time. There is no blank form, so every entry stays auditable.

How forecast accuracy is scored → · Reference →