Ataski
Sign up free
Sample workspace — example data, not your own. Sign up free to run it on your own.
Example: Manufacturing
Change example

Which choices need action, which are underway, and did the last ones land.

Ask the analyst

Available on every tab in your workspace — answers come with sources, the period, the calculation, and a confidence level.

Answers run on your connected books after signup. The sample keeps every number deterministic — it never improvises a reply.

Decisions

Where the team answers the questions Today and the scenarios raise — and later checks how each call landed.

Needs your decision0
In progress1
Outcome recorded1

Needs your decision

The review window has arrived — check what the metric actually did and settle the call.

Nothing is waiting on you. New questions appear on Today. Open Today →

In progress · review scheduled

Captured and owned; the outcome is re-checked automatically on later closes.

In review Decided 2026-05-20 · Observed
Finished-goods inventory days rose to 84 from 79 — the delayed Reigate assembly run pushed $186K of completed units into inventory ahead of the June ship date. Raw-materials and WIP held flat, so this is a finished-goods timing build, not a demand miss.
Assigned for review · Owner: You · Review by: 2026-06-05
Next: nothing to do yet — the outcome is checked automatically after the review date.
Financial effect at decision time
$186,000
Assumptions on the day
· impact is a one-time working-capital level move — not annualised
· 2 source citation(s) back the period figures

What happened

Reported as an association over the review window — other factors also changed, never proof of cause.

Outcome recorded Decided 2026-04-17 · Observed
Approved: hold the next Reigate assembly run to make-to-order and draw down the early finished-goods build before restocking.
Modelled a scenario · Owner: Priya Anand (Ops) · Review by: 2026-06-12
Financial effect at decision time
$84
Assumptions on the day
· The June ship date had enough buffer to absorb a make-to-order run.
· Raw + WIP inventory were already at plan — only finished goods had built.
Since this decision · Inferred
At decision84
At review79
Movement-5
Hypothesis holds (inferred)
An inferred association over a window where other factors also changed — never a proven cause.

Decisions are captured from Today cards and modeled scenarios — with the numbers as they stood at decision time. There is no blank form, so every entry stays auditable.